EVANTEON Battery SystemsRequest a Quote

Quality control & acceptance

Battery inspection & acceptance.

Agree how your batteries will be checked, which results will be recorded and what must pass before shipment.

Incoming raw-material laboratory inspection

Control the exact battery configuration.

Quality control verifies each applicable characteristic against approved drawings, configuration records, test methods and project-specific acceptance criteria. The scope is agreed for the battery, equipment and destination before production release.

Configuration & traceability

Confirm cell model and lot, pack serial, released BOM and drawings, BMS hardware, firmware and parameter revision.

Open the control method ↗

Incoming & in-process control

Apply agreed cell acceptance, polarity, joint, insulation, harness, torque, workmanship and calibrated-fixture checks at the relevant build steps.

Open the control method ↗

Electrical & functional

Verify voltage, sensing, current path, charge and discharge behavior, protection states, communications and charger or equipment interaction.

Open the control method ↗

Mechanical & thermal

Check envelope, mounting, retention, compression where required, thermal interfaces, sensor placement, clearances and enclosure condition.

Open the control method ↗

End-of-line & release

Run the agreed power-up, functional and measurement sequence; record acceptance status, deviations, rework and the released unit identity.

Open the control method ↗

Packing & handover

Confirm shipment state of charge, terminal protection, labels, item count, packing record and the applicable transport and handover documents.

Open the control method ↗

What is checked before each order stage.

Agree the checks and records for each stage, from the first quotation to repeat orders. Resolve open requirements through sample testing and design review.

01

Before quotation

Required input

Equipment duty, environment, quantity, target market and required evidence.

What you review

Proposed validation scope, acceptance assumptions and open questions.

02

Before prototype

Required input

Released architecture, interfaces and prototype success criteria.

What you review

Build revision, prototype check plan and identified measurement points.

03

Before pilot

Required input

Accepted prototype results, deviations and corrective actions.

What you review

Updated BOM and drawings, work instructions and pilot inspection criteria.

04

Before production

Required input

Approved configuration, control plan and allowed process limits.

What you review

Released production revision, inspection flow and traceability record set.

05

Before shipment

Required input

Agreed release criteria, packing, labels and document scope.

What you review

Inspection status, unit or batch records, packing record and handover package.

06

Before repeat orders

Required input

Released revision, approved changes, field feedback, required quantity and delivery plan.

What you review

Confirmed configuration, updated control documents and the agreed repeat-build scope.

Make every result comparable and reviewable.

Identity

Which unit was tested?

Pack serial or sample ID, cell lot, build date and released hardware and software revision.

Review the evidence guide ↗
Method

How was it measured?

Equipment, calibration status, connection boundary, procedure, sampling interval and test conditions.

Review the evidence guide ↗
Decision

Did it meet the requirement?

Acceptance limit, measured result, deviation disposition, reviewer and release status.

Review the evidence guide ↗

Documents to agree with your battery order.

Unit or batch identity

Serials, cell lot and configuration revision tied to the supplied units.

Inspection record

Applicable incoming, in-process and end-of-line results with acceptance status.

UN 38.3 transport evidence

Applicable UN 38.3 test summary for the supplied cell or battery type, with shipment classification and route-specific dangerous-goods documents.

SDS / MSDS

Current safety data sheet for the supplied cell or battery where required by the customer, carrier, destination market or shipment route.

Product compliance

Applicable IEC, UL or other market-specific reports and certificates are defined for the exact product, application and destination before quotation.

Deviation & change record

Approved departures, rework disposition and reviewed component or process changes.

Shipment package

Packing, labels and applicable transport, test-summary and handover documents defined in the order.

Battery-module frames, busbars, wiring harness and flexible heater
Battery-module frames, busbars, wiring harness and flexible heater
Automated pouch handling on the production line
Automated pouch handling on the production line
Pouch-cell charging before shipment
Pouch-cell charging before shipment

Prepare inspection requirements for your battery.

Include your equipment, battery requirements and quantities. Add an existing drawing or configuration reference where available.

PROJECT ENQUIRY

Prepare your battery brief.

Start with the information you have. Your selected battery, application and service are already included.

Open as a full page ↗