EVANTEON Battery SystemsRequest a Quote

Applications / Equipment duty

Energy storage built around the site duty.

Catalog-backed LFP architectures for high-rate backup, commercial and industrial storage, and utility-scale systems.

Open industrial energy storage cabinet with installed LFP modules

Choose the part of the storage system you need.

Separate backup power, C&I storage and utility systems before selecting hardware.

Backup duration, cycling frequency, PCS interface and site conditions guide the choice between a high-rate UPS cabinet, a C&I system and containerized utility storage.

Packs, racks and complete storage systems.

Start at pack, rack or complete-system level according to what the project already defines and what still needs engineering.

Compare voltage, capacity, discharge demand, charging method and mechanical interfaces against the equipment duty before sample validation.

Engineering questions to resolve

Operating objective

Is the system protecting a load, shifting energy or supporting the grid?

Define backup duration, daily cycling, peak-shaving profile, renewable input and required reserve.

Inputs
Backup load, cycling schedule, renewable generation, export limits and reserve requirement.
Decision output
An energy and power requirement with response time, operating window and required availability.

Power and duration

Which combination of kW, kWh and response time is required?

Match power, usable energy, C-rate and thermal architecture to the complete duty profile.

Inputs
Load-side and battery-side power boundaries, converter efficiency, discharge duration and lowest DC voltage.
Decision output
Usable energy and peak-current targets with separate temperature, aging and reserve assumptions.

Site interface

How will the battery connect to PCS, EMS, transformer and facility controls?

Resolve DC window, communications, protection boundaries and commissioning responsibilities.

Inputs
PCS DC window, EMS protocol, isolation boundary, precharge requirements and commissioning ownership.
Decision output
A control and protection interface definition with startup, shutdown and communication-fault states.

Safety and service

How will the system be isolated, monitored and maintained?

Develop segmentation, detection, thermal control, access and fault response around the site plan.

Inputs
Installation location, applicable standards, access, isolation points and cooling fault cases.
Decision output
A system-specific safety and service review with evidence owners and acceptance criteria.
Open industrial ESS cabinet with installed battery modules
Open industrial ESS cabinet with installed battery modules
Close view of installed ESS battery modules
Close view of installed ESS battery modules
Liquid-cooled LFP energy-storage pack with metal enclosure and service interfaces
Liquid-cooled LFP energy-storage pack with metal enclosure and service interfaces
Containerized utility-scale energy-storage system
Containerized utility-scale energy-storage system

Choose the work your project needs.

Prepare this application brief

Discuss your battery requirements.

Include your equipment, battery requirements and quantities. Add an existing drawing or configuration reference where available.

PROJECT ENQUIRY

Prepare your battery brief.

Start with the information you have. Your selected battery, application and service are already included.

Open as a full page ↗